Our recently acquired Terex Demag TC2800 was the main Crane on site at Windy Rig Wind Farm, Dumfries & Galloway, Scotland to support the installation of 12 Wind Turbines on behalf of AIS Wind Energy, as well as a number of other assist cranes and trucks that were responsible for the safe movement of all […]
This project involved the installation of 37 new wind turbines at Cassadaga Wind Farm, Buffalo, New York, resulting in a total renewable energy capacity of 125.5 MW. Wm. O’Brien was responsible for the: – Project management of all heavy lift activities – Crane hire – Personnel hire and supervision – Liaison with local Iron […]
Project brief: To provide heavy lift project management, equipment and staff to help with the installation of 25 wind turbines at Crossing Trails Wind Farm in Colorado giving a total wind energy capacity of 104MW. Type of turbines installed: 20x Vestas V150 4.3 MW wind turbines 5x Vestas V136 3.6 MW wind turbines […]
Project Scope: To support the installation of 48 Vestas wind turbines for Harvest Ridge Wind Farm in Illinois with a total wind energy capacity of 200MW. Location: Harvest Ridge Wind Farm, located in northeastern Douglas County, Newman, Illinois, USA Date: June 2020 Equipment included: Terex/Demag CC6800, Liebherr LR 11000, Liebherr LR […]
Client: Liebherr Container Cranes Location: PSA Penn Terminals, Philadelphia, USA Date: April 2019 Heavy Lift Equipment: Liebherr LR1400 crawler cranes, Liebherr LTM 1160 mobile cranes and a 24-axle line SPMT Wm. O’Brien assisted Liebherr Container Cranes with the assembly of 2 Ship to Shore (STS) cranes at PSA Penn Terminal, in Philadelphia, USA. […]
Client: STS Group Location: Limerick, Ireland As part of a major upgrade programme by a multinational biotechnology company, STS Group engaged Wm. O’Brien for all lifting activities associated with the Modular Substation Project. The following scope was undertaken for the successful delivery of the project: – Logistics plan covering the transportation of […]
Client: Kirby Group Engineering on behalf of Janssen Sciences Ireland Location: Cork During a €300m expansion project for Janssen Sciences, Wm. O’Brien was responsible for the rigging and assembly of 15 air handling units (AHUs). Involving a complex lift and shift operation, the AHUs needed to be manoeuvred and assembled in a tight environment, […]
Wm. O’Brien was responsible for the offloading and assembly of 12x E70 turbines at Bunnyconnellan, Co Mayo.
Wm. O’Brien was responsible for all the mechanical engineering and complete assembly of 2 Ship to Shore (STS) cranes.
Our scope for the Doyle Shipping Group project was to dismantle a 50+ year old port crane as it had come to the end of its useable life and was going to be.