Case Study

Turbine Offload & Installation for GE Renewable Energy

Turbine Offload & Installation for GE Renewable Energy

Client: GE Renewable Energy

 

Date: September 2019

 

Cranes: LTM 11200 and 2x Grove 130

 

Heaviest load: 83 ton

 

Wm. O’Brien assisted GE Renewable Energy with the offload and assembly of 9 turbines for Glenmore Wind Farm, Co Clare, Ireland.

 

 