Turbine Offload and Assembly for Enercon

Turbine Offload and Assembly for Enercon

Client:   Enercon

 

Location:   Bunnyconnellan Wind Farm, Co Mayo, Ireland

 

Date:   December 2019

 

Cranes:   2x LTM 11200 and 4x Grove 130

 

Wm. O’Brien was responsible for the offloading and assembly of 12x E70 turbines at Bunnyconnellan, Co Mayo.  The wind farm is situated in a place known locally as the ‘windy gap’. With a team of 6 on site, 2x 130t cranes were used for offloading the components, with 2x LTM 11200 cranes used for installation, supported by another 2 x 130t cranes.