Turbine Offload and Assembly for Enercon
Client: Enercon
Location: Bunnyconnellan Wind Farm, Co Mayo, Ireland
Date: December 2019
Cranes: 2x LTM 11200 and 4x Grove 130
Wm. O’Brien was responsible for the offloading and assembly of 12x E70 turbines at Bunnyconnellan, Co Mayo. The wind farm is situated in a place known locally as the ‘windy gap’. With a team of 6 on site, 2x 130t cranes were used for offloading the components, with 2x LTM 11200 cranes used for installation, supported by another 2 x 130t cranes.